Tata Harrier EV Empowered 75 RWD
₹27,69,000 (ex-showroom)
sourced from official listings · sourced 2026-07-16 · how we verify
How much does the Tata Harrier EV Empowered 75 RWD cost?
The Tata Harrier EV Empowered 75 RWD is priced at ₹27,69,000 ex-showroom in India (as of 2026-07-16). This excludes RTO registration, insurance, and any state EV subsidy; on-road price varies by state.
How long does the Tata Harrier EV Empowered 75 RWD take to charge?
The Tata Harrier EV Empowered 75 RWD takes approximately 0.42 hours to charge from a standard home charger. It uses a 75 kWh battery.
Full specifications
| ARAI range | 627 km |
|---|---|
| Battery | 75 kWh |
| Charging time | 0.42 hr |
| Top speed | 180 km/h |
| Motor power | 175 kW |
Subsidy: EVs attract a 5% GST rate versus 28% plus cess on petrol cars; state road-tax/registration waivers apply under many EV policies.
Pros
- 627 km claimed range
- DC 20-80% in ~25 min
- Flagship size, power and features
Cons
- Real-world well below the claim
- Premium pricing
On-road price in your city
- Ex-showroom₹27,69,000
- Road tax waived for EVs₹0
- Registration waived for EVs₹0
- Insurance (est.)₹96,915
EV road tax & registration are waived in Delhi.
Estimate as of July 2026. Includes ex-showroom, road tax, registration and an insurance estimate, less any state EV subsidy; excludes dealer handling. Delhi EV Policy 2026: road tax and registration waived for EVs; e-2W get a ₹30,000 purchase subsidy (ex-factory up to ₹2.25 lakh). No direct cash subsidy for e-cars. source.
On-road price by city: Delhi · Bengaluru · Mumbai · Pune · Hyderabad · Chennai
Cost of ownership
Based on 40 km/day, the Tata Harrier EV Empowered 75 RWD costs about ₹1,600/month to run versus ₹8,400/month for a comparable petrol car, a saving of ₹82,733/year at July 2026 prices.
| Monthly | Annual | 5-year | |
|---|---|---|---|
| Petrol | ₹8,400 | ₹1,02,200 | ₹5,11,000 |
| EV | ₹1,600 | ₹19,467 | ₹97,335 |
| You save | ₹6,800 | ₹82,733 | ₹4,13,665 |
Assumes 15 km/l petrol, 6 km/kWh EV, ₹105/l petrol and ₹8/kWh electricity, 40 km/day. Figures as of July 2026.
Get the on-road price
Verification: sourced - sourced 2026-07-16 · source